UG Underground
UG — Underground Transfer Plant
A 180 t/h transfer station designed to the roadway cross-section, inside 4.2 m of clear height.
180 t/h 20 weeks
Each circuit record states the code it is quoted under, the mine setting it was designed for, its rated capacity and the lead time on the first parts.
UG Underground
A 180 t/h transfer station designed to the roadway cross-section, inside 4.2 m of clear height.
180 t/h 20 weeks
OP Open pit
A 400 t/h open-pit circuit with primary crushing at the pit edge and secondary screening in one steel tower.
400 t/h 16 weeks
AG Quarry
A 250 t/h quarry line producing three EN 12620 products, with the screen cut points fixed before the cone is sized.
250 t/h 14 weeks
Planned: filtering and comparison
Filter the circuits by mine setting and rock type
A filter row over the mine settings and rock types the circuits already carry, and a comparison view that puts two chosen circuits side by side — rated capacity, products and lead time in one table.