UG — Underground Transfer Plant

A 180 t/h transfer station designed to the roadway cross-section, inside 4.2 m of clear height.

UG 180 t/h 20 weeks

Underground

UG exists because a decline is not a quarry. Everything has to fit inside the roadway cross-section with 4.2 m of clear height, and it has to be assembled underground by the mine’s own crew on a shift schedule.

That constraint drives every part choice. The RC-J1200 frame is a bolted fabrication rather than a casting, so it ships in sections that pass the decline, and the assembly sequence is written before the first bolt is made — not improvised at the station.

180 t/h. Lower than the open-pit line on purpose: underground, the limit is the skip and the ventilation, not the crusher.

Process, step by step

  1. Receiving from the decline haul

    RC-VF1100 Vibrating Grizzly Feeder

  2. Primary crushing to skip size

    RC-J1200 Jaw Crusher

  3. Transfer to the skip loading point

    RC-B1200 Overland Conveyor

Who supplies what

Scope of supply on this circuit
Item Responsible
Mass balance, fits-to-roadway drawings and assembly sequence Ridgecast supplies
Chamber excavation, lining and sump On the mine
Machines and bolted steelwork supply Ridgecast supplies
Hoisting and underground transport to the station On the mine
Assembly supervision and first-ore commissioning Ridgecast supplies