Quoting & process
What a crushing plant quote actually needs
A price without a sample, a product split, a setting and a scope boundary is not a quote — it is a range wide enough to be useless. Here is what actually…
25 Oct 2026
Quoting & process
A price without a sample, a product split, a setting and a scope boundary is not a quote — it is a range wide enough to be useless. Here is what actually…
25 Oct 2026
Selection & specification
A transfer station inside 4.2 m of clear height is a transport and assembly problem before it is a crushing problem — and the cross-section, not the crusher, is the specification.
25 Oct 2026
Wear & spare parts
A description fits several machines and some of them will not close. The drawing number is the only identifier that carries tooth profile, thickness, hole position and alloy without argument.
25 Oct 2026
Site & installation
CSS, stroke, current and achieved capacity, signed on the day the ore first runs. It is the only document that still answers questions two years later.
25 Oct 2026
Planned: filtering and comparison
Filter the notes by category and rock type
A filter row over the categories and rock types the notes already carry, and a comparison view that sets two notes side by side, for reading one argument against another.